New Valve Cluster, Mixer Cluster and Modification of Technological Lines

June 23, 2025
Home » New Valve Cluster, Mixer Cluster and Modification of Technological Lines

Turn- key project including preparation of the technical-technological solution, design, manufacturing and installation of equipment, participation in automation and commissioning, engineering, project management

Project scope:

  • Modification of 5 mixers for blending fruit into fermented dairy products with fruit to 2 ultraclean mixers, each with three product pumps. Requirement: high level of preservation of fruit structure during blending
  • Production and installation of a valve block with mix-proof valves to connect technological lines from fermentation to filling machines. Requirements: Orbital welding of the block at the installation site. Modifications carried out during production operation
  • Modification of technological lines for product supply to filling machines